  1. Introduction

This article studies the impact of the passing of a moratorium order in proceedings against a corporate debtor ("CD") under the Insolvency and Bankruptcy Code ("IBC") on arbitration proceedings pending at various stages by and/or against the said CD.

  1. Relevant Legal Provisions
  1. The objects and reasons of IBC are stated, inter alia, as follows:

"An Act to consolidate and amend the laws relating to reorganization and insolvency resolution of corporate persons, partnership forms and individuals in a timebound manner for maximization of value of assets of such persons...."

  1. "14. (1) Subject to provisions of sub- sections (2) and (3), on the insolvency commencement date, the Adjudicating Authority shall by order declare moratorium for prohibiting all of the following, namely:--

(a) the institution of suits or continuation of pending suits or proceedings against corporate debtor including execution of any judgment, decree or order in any court of law, tribunal, arbitration panel or other authority;" (emphasis supplied)

  1. "238. Provisions of this Code to override other laws.-- The provisions of this Code shall have effect, notwithstanding anything inconsistent therewith contained in any other law for the time being in force or any instrument having effect by virtue of any such law."
  1. Possible Scenarios

During the course of a typical arbitration, the following scenarios can arise:

A) Claims are only made by the CD with no counter claims against the CD

B) Claims are only made against the CD with no counter claims by the CD

C) Claims (and counter claims) are made inter se the corporate debtor and the Opposite Party(ies)

D) Post arbitral proceedings are pending in the nature of ss. 34/36 of the Arbitration and Conciliation Act, 1996 ("Arbitration Act")

a) the arbitral award being in favor of CD

b) the arbitral award being against CD

c) the arbitral award being an admixture of (a) and (b) above

E) Enforcement proceedings against the CD under a foreign award are pending before courts in India.

This article attempts to examine the impact of, inter alia, ss. 14 and 238 of the IBC on the aforesaid scenarios.

  1. The Legal Position

(i) As far as scenario A) is concerned i.e. claims are made by a CD with no counter claims against it, s. 14(1)(a) does not ex facie constitute a bar to the continuance of such arbitration proceedings as the said provision only interdicts the institution of suits or continuation of pending suits or proceedings against the CD. Thus, the arbitration claim by the CD will continue or can be instituted.

(ii) As far as scenario B) is concerned, i.e. claims are only made against the CD with no counter claims by the CD, s. 14(1)(a) ex facie constitutes a bar to the institution/ continuance of such arbitration proceedings.

The Hon'ble Supreme Court in Alchemist Asset Reconstruction Company Ltd. v Hotel Gaudavan Pvt. Ltd. AIR 2017 SC 5124 ("Alchemist") has held that,

"4. The mandate of the new Insolvency Code is that the moment an insolvency petition is admitted, the moratorium that comes into effect under s. 14(1)(a) expressly interdicts institution or continuation of pending sits or proceedings against Corporate Debtors."

5. This being the case, we are surprised that an arbitration proceeding has been purported to be started after the imposition of the said moratorium and appeals under Section 37 of the Arbitration Act are being entertained. Therefore, we set aside the order of the District Judge dated 06.07.2017 and further state the effect of Section 14(1)(a) is that the arbitration that has been instituted after the aforesaid moratorium is non est in law."

Though the Alchemist dealt with an arbitral proceeding instituted after the imposition of moratorium under IBC, the NCLAT in it's order dated 30.1.2018 passed in K.S. Oils Ltd. v The State Trade Corporation of India Ltd. & Ors. [2018] 146 SCL 588 ("K.S. Oils Ltd. ") applied the aforesaid principle to pending arbitral proceedings i.e. arbitral proceeding which had commenced before the imposition of moratorium under IBC as well. According to the NCLAT, this position also obtained from s. 238 of the IBC which provided overriding effect to the IBC over the Arbitration and Conciliation Act, 1996 ("Arbitration Act"). The NCLAT was of the view that the after initiation of the corporate insolvency resolution process, all creditors (including parties to the pending arbitration) could file their claims before the Resolution Professional pursuant to the declaration of moratorium and public announcement under s. 13/14 of the IBC. The NCLAT in the operative portion of the K.S. Oils Ltd. order said:

"13. In view of the provisions as referred to the above and the decision of the Hon'ble Supreme Court in "Alchemist Asset Reconstruction Company Ltd. v. M/s. Hotel Gaudavan Pvt. Ltd. & Ors." we hold that the arbitral proceeding pending between 'M/s K.S. Oil Ltd.' (Corporate Debtor) and 'The State Trade Corporation of India Ltd.' (Financial Creditor) before the Indian Council of Arbitration cannot proceed during the moratorium period.

14. For the reasons recorded above while we are not inclined to interfere with the part of the impugned order whereby the Adjudicating Authority refused to set aside the order passed by the Indian Council of Arbitration, declare that the Arbitration Tribunal/Indian council of Arbitration cannot proceed with the arbitral proceeding pending between the parties. Both the parties are directed not to pursue arbitral proceeding before the Arbitration Tribunal/Indian Council of Arbitration till final order is passed by the Adjudication Authority on the resolution plan and completion of the moratorium period. However, it will open to both of them to file their respective claim and counter claim, if any, before the Resolution Professional. The appeal stands disposed of with the aforesaid observations and directions. No Costs." (emphasis supplied)

The NCLAT judgment in K.S. Oils Ltd. does not reveal whether the arbitration in question involved both claims and counter claims. It appears that the liberty given to both parties to file their respective claims and counter claims before the Resolution Professional would fall foul of the NCLAT order in Jharkhand Bijli Vitran Nigam Limited v IVRCL Ltd. (Corporate Debtor) & Anr. CP (IB) No. 294/7/HDB/2017 discussed below.

(iii) As far as scenario C) is concerned, i.e. claims (and counter claims) are made inter se the corporate debtor and the Opposite Party(ies), there has been some divergence of opinion, which appears to have been settled by the NCLAT. Of course, this is till such time the Hon'ble Supreme Court reconsiders this position.

The NCLT, Hyderabad Bench in Jharkhand Bijli Vitran Nigam Limited v IVRCL Ltd. (Corporate Debtor) & Anr. CP (IB) No. 294/7/HDB/2017 held that in the arbitration proceedings in question, the claim made by the corporate debtor could proceed but the counter claim filed against the corporate debtor could not be allowed to proceed. The NCLT however recognized the difficulties involved in segregating a lis in such a manner and left it upon the arbitral tribunal to take an independent view whether the claim of the corporate debtor and counter claim against the corporate debtor could be separately proceeded or not.

The NCLAT reversed the aforesaid decision of the NCLT vide it's order dated 03.08.2018 passed in Jharkhand Bijli Vitran Nigam Limited v IVRCL Ltd. (Corporate Debtor) & Anr. [Company Appeal (AT)(Insolvency) No. 285 of 2018]. The NCLAT allowed the arbitration proceedings to continue and held

"3. As the claim of the Corporate Debtor can be determined only after determination of counter claim made by the Appellant in the same very arbitral proceedings and if counter claim or part of it is set off with the claim made by the Corporate Debtor, were of the view that both the claim and the counter claim of parties should be heard together by the Arbitral Tribunal in absence of any bar under Insolvency and Bankruptcy Code, 2016.

4.However, on determination, if it is found that the Corporate Debtor is liable to pay certain amount, in such case, no recovery can be made during the period of moratorium." (emphasis supplied)

Thus, arbitrations involving claims (and counter claims) made by and against the corporate debtor may not be hit by section 14(1)(a) during the pre- award stage, and will be proceeded with. Thus, the moratorium may come into effect depending on the award in the arbitration proceedings. If the award is against the corporate debtor, the moratorium will apply for the period stated in the IBC to bar a recovery action. The question that arises is as to whether a s. 34 application under the Arbitration Act filed by Opposite Party to set aside an award in favor of the CD would be maintainable. This question is answered in the succeeding scenario.

(iv) As far as scenario D) is concerned, i.e. post arbitral proceedings being pending in the nature of ss. 34/36 of the Arbitration and Conciliation Act, 1996 ("Arbitration Act") with

a) the arbitral award being in favor of CD

b) the arbitral award being against CD

c) the arbitral award being an admixture of (a) and (b) above;

In light of the limitations to a strict interpretation approach to s. 14, the courts have adopted a purposive interpretative approach keeping in mind the object/ policy behind the IBC. In the event, an award is in favor of the CD, the moratorium under s. 14 would not bar the recovery of such dues owed to the CD by way of execution of such award under s. 36 of the Arbitration Act. However, if the monetary award is against the CD, the moratorium under s. 14 would be triggered to bar recovery of such dues owed by the CD by way of execution of such award under s. 36 of the Arbitration Act.

A question arose as to whether a s. 34 proceeding would lie against the award in favor of the CD. This was answered by the Hon'ble Delhi High Court in it's judgment dated 11.12.2017 in Power Grid Corporation of India Ltd. v. Jyoti Structures Ltd. 246 (2018) DLT 485 ("Power Grid"), while construing the scope of s. 14(1)(a) of the IBC, has held,

"8. The object of the Code is to provide relief to the corporate debtor through "standstill" period during which its assets are protected from dissipation or diminishment, and as a corollary, during which it can strengthen its financial position, .......... To determine the true meaning of the statute, the provision would have to be construed in the context of the statute as a whole, for which purpose interpretative criteria may have to be applied even when the statutory language is apparently free from any semantic ambiguity......

10. In the light of above purpose or object behind the moratorium, Section 14 of the Code would not apply to the proceedings which are in the benefit of the corporate debtor, like the one before this court in as much these proceedings are not a 'debt recovery action' and its conclusion would not endanger, diminish, dissipate or impact the assets of the corporate debtor in any manner whatsoever and hence shall be in sync with the purpose of moratorium which includes keeping the corporate debtor's assets together during the insolvency resolution process and facilitating orderly completion of the process envisaged during the insolvency resolution process and ensuring the company may continue as a going concern.

In striking this purposive interpretative approach, the court, inter alia, held that 'proceedings' under s. 14(1)(a) of the IBC did not include 'all proceedings' and the term "proceeding" would be restricted to the nature of action that follows it i.e. debt recovery action against assets of the corporate debtor. The court further held that the moratorium under s. 14(1)(a) of the IBC is intended to prohibit debt recovery actions against the assets of the corporate debtor and continuation of proceedings which do not result in endangering, diminishing, dissipating or adversely impacting the assets of corporate debtor are not prohibited under section 14(1)(a) of the IBC.

The court further observed that the Arbitration Act draws a distinction between proceedings under section 34( i.e. objections to the award) and under section 36(i.e. the enforceability and execution of the award). The proceedings under section 34 are a step prior to the execution of an award. Only after determination of objections under section 34, the party may move a step forward to execute such award and in case the objections are settled against the corporate debtor, its enforceability against the corporate debtor then certainly shall be covered by moratorium of section 14(1)(a).

(v) As far as scenario E) is concerned, i.e. when enforcement proceedings against the CD under a foreign award are pending before Indian courts, a question may arise as to whether a proceeding under s. 48 of the Arbitration Act will lie to enforce a foreign award against the CD.

Once a foreign award is passed, the same cannot be enforced immediately like a domestic award. The said award has to be initially put through the process of enforcement, which is mandatory before an award could be executed. The provisions of the Arbitration Act, particularly Ss. 47, 48 and 49 envisage the mode and manner in which a foreign award is to be enforced and could be executed.

The party seeking to enforce the award has to make an application under S. 47 of the Act enclosing therewith the evidence mentioned therein. Such an application could be resisted by the party against whom enforcement is sought by furnishing proof to the court of the existence of one or more of the defences as set out in S. 48 of the Act.

It is only when the Court decides and records its satisfaction that the award is enforceable, then only the award could be enforced as a decree of the court. It is now a settled law as laid down in Fuerst Day Lawson Ltd. vs. Jindal Export, (2001) 6 SCC 356 that it is not necessary to take up separate proceedings one for deciding the enforceability of the award and the other to take up execution thereafter and that both the reliefs could be sought for in the same proceedings.

It could be argued that proceedings till the stage of deciding upon the question of enforceability of the award may not be hit by a moratorium and that only if the CD fails on this account would the moratorium apply to the subsequent proceedings executing the award against the CD. Thus, the NCLT, Ahmedabad Bench in Vitol S.A. v Asian Natural Resources 9India) Ltd. & Ors. [2018] 145 SCL 30 applied the moratorium under s. 14 of the IBC to the execution proceedings against the CD which were pending after the objections under s. 48 of the Arbitration Act to the enforceability of the foreign award had been rejected and stayed the said execution proceedings. The question whether such proceedings would have been maintainable at the stage of deciding of objections under s. 48 of the Arbitration Act relating to enforceability of the foreign award was however not in issue before the learned Tribunal.

However, it appears from a reading of the Alchemist judgment that the courts may be reluctant to entertain the very institution or continuation of the enforcement proceedings of a foreign award against the CD at any stage.

An interesting question would be the application of a moratorium on the execution of a foreign award against a CD which has assets outside India.

We can derive guidance in this regard from the judgment of the Hon'ble High Court of Bombay in Ashapura Minechem Ltd. v Armada ( Singapore) Pte. Ltd. & Ors. MANU/MH/1123/2016 which was decided in the context of s. 22 of the Sick Industrial Companies (Special Provisions) Act, 1985 ("SICA") which is a similar provision to s. 14 of the IBC. The court held that since the provisions of SICA including s. 22 thereof extend to only the territory of India , the same do not have any application to proceedings outside India. Thus, there was no requirement of prior consent of the Board of Industrial and Financial Reconstruction ("BIFR") for taking steps in execution of foreign awards including filing garnishee proceedings in respect of properties of the judgment debtor situated outside India. On the same logic, in view of s. 1 of the IBC which extends the said Act to India, it could be inferred that the moratorium under s. 14 of the IBC would not apply to execution of a foreign award against a CD which has assets outside India. Of course, the situation would change should reciprocal arrangements be in place with other countries , to enforce the IBC (as envisaged in ss. 234 and 235 of the IBC).

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

To print this article, all you need is to be registered on Mondaq.com.

Click to Login as an existing user or Register so you can print this article.

Authors
Similar Articles
Relevancy Powered by MondaqAI
 
In association with
Related Topics
 
Similar Articles
Relevancy Powered by MondaqAI
Related Articles
 
Related Video
Up-coming Events Search
Tools
Print
Font Size:
Translation
Channels
Mondaq on Twitter
 
Mondaq Free Registration
Gain access to Mondaq global archive of over 375,000 articles covering 200 countries with a personalised News Alert and automatic login on this device.
Mondaq News Alert (some suggested topics and region)
Select Topics
Registration (please scroll down to set your data preferences)

Mondaq Ltd requires you to register and provide information that personally identifies you, including your content preferences, for three primary purposes (full details of Mondaq’s use of your personal data can be found in our Privacy and Cookies Notice):

  • To allow you to personalize the Mondaq websites you are visiting to show content ("Content") relevant to your interests.
  • To enable features such as password reminder, news alerts, email a colleague, and linking from Mondaq (and its affiliate sites) to your website.
  • To produce demographic feedback for our content providers ("Contributors") who contribute Content for free for your use.

Mondaq hopes that our registered users will support us in maintaining our free to view business model by consenting to our use of your personal data as described below.

Mondaq has a "free to view" business model. Our services are paid for by Contributors in exchange for Mondaq providing them with access to information about who accesses their content. Once personal data is transferred to our Contributors they become a data controller of this personal data. They use it to measure the response that their articles are receiving, as a form of market research. They may also use it to provide Mondaq users with information about their products and services.

Details of each Contributor to which your personal data will be transferred is clearly stated within the Content that you access. For full details of how this Contributor will use your personal data, you should review the Contributor’s own Privacy Notice.

Please indicate your preference below:

Yes, I am happy to support Mondaq in maintaining its free to view business model by agreeing to allow Mondaq to share my personal data with Contributors whose Content I access
No, I do not want Mondaq to share my personal data with Contributors

Also please let us know whether you are happy to receive communications promoting products and services offered by Mondaq:

Yes, I am happy to received promotional communications from Mondaq
No, please do not send me promotional communications from Mondaq
Terms & Conditions

Mondaq.com (the Website) is owned and managed by Mondaq Ltd (Mondaq). Mondaq grants you a non-exclusive, revocable licence to access the Website and associated services, such as the Mondaq News Alerts (Services), subject to and in consideration of your compliance with the following terms and conditions of use (Terms). Your use of the Website and/or Services constitutes your agreement to the Terms. Mondaq may terminate your use of the Website and Services if you are in breach of these Terms or if Mondaq decides to terminate the licence granted hereunder for any reason whatsoever.

Use of www.mondaq.com

To Use Mondaq.com you must be: eighteen (18) years old or over; legally capable of entering into binding contracts; and not in any way prohibited by the applicable law to enter into these Terms in the jurisdiction which you are currently located.

You may use the Website as an unregistered user, however, you are required to register as a user if you wish to read the full text of the Content or to receive the Services.

You may not modify, publish, transmit, transfer or sell, reproduce, create derivative works from, distribute, perform, link, display, or in any way exploit any of the Content, in whole or in part, except as expressly permitted in these Terms or with the prior written consent of Mondaq. You may not use electronic or other means to extract details or information from the Content. Nor shall you extract information about users or Contributors in order to offer them any services or products.

In your use of the Website and/or Services you shall: comply with all applicable laws, regulations, directives and legislations which apply to your Use of the Website and/or Services in whatever country you are physically located including without limitation any and all consumer law, export control laws and regulations; provide to us true, correct and accurate information and promptly inform us in the event that any information that you have provided to us changes or becomes inaccurate; notify Mondaq immediately of any circumstances where you have reason to believe that any Intellectual Property Rights or any other rights of any third party may have been infringed; co-operate with reasonable security or other checks or requests for information made by Mondaq from time to time; and at all times be fully liable for the breach of any of these Terms by a third party using your login details to access the Website and/or Services

however, you shall not: do anything likely to impair, interfere with or damage or cause harm or distress to any persons, or the network; do anything that will infringe any Intellectual Property Rights or other rights of Mondaq or any third party; or use the Website, Services and/or Content otherwise than in accordance with these Terms; use any trade marks or service marks of Mondaq or the Contributors, or do anything which may be seen to take unfair advantage of the reputation and goodwill of Mondaq or the Contributors, or the Website, Services and/or Content.

Mondaq reserves the right, in its sole discretion, to take any action that it deems necessary and appropriate in the event it considers that there is a breach or threatened breach of the Terms.

Mondaq’s Rights and Obligations

Unless otherwise expressly set out to the contrary, nothing in these Terms shall serve to transfer from Mondaq to you, any Intellectual Property Rights owned by and/or licensed to Mondaq and all rights, title and interest in and to such Intellectual Property Rights will remain exclusively with Mondaq and/or its licensors.

Mondaq shall use its reasonable endeavours to make the Website and Services available to you at all times, but we cannot guarantee an uninterrupted and fault free service.

Mondaq reserves the right to make changes to the services and/or the Website or part thereof, from time to time, and we may add, remove, modify and/or vary any elements of features and functionalities of the Website or the services.

Mondaq also reserves the right from time to time to monitor your Use of the Website and/or services.

Disclaimer

The Content is general information only. It is not intended to constitute legal advice or seek to be the complete and comprehensive statement of the law, nor is it intended to address your specific requirements or provide advice on which reliance should be placed. Mondaq and/or its Contributors and other suppliers make no representations about the suitability of the information contained in the Content for any purpose. All Content provided "as is" without warranty of any kind. Mondaq and/or its Contributors and other suppliers hereby exclude and disclaim all representations, warranties or guarantees with regard to the Content, including all implied warranties and conditions of merchantability, fitness for a particular purpose, title and non-infringement. To the maximum extent permitted by law, Mondaq expressly excludes all representations, warranties, obligations, and liabilities arising out of or in connection with all Content. In no event shall Mondaq and/or its respective suppliers be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits, whether in an action of contract, negligence or other tortious action, arising out of or in connection with the use of the Content or performance of Mondaq’s Services.

General

Mondaq may alter or amend these Terms by amending them on the Website. By continuing to Use the Services and/or the Website after such amendment, you will be deemed to have accepted any amendment to these Terms.

These Terms shall be governed by and construed in accordance with the laws of England and Wales and you irrevocably submit to the exclusive jurisdiction of the courts of England and Wales to settle any dispute which may arise out of or in connection with these Terms. If you live outside the United Kingdom, English law shall apply only to the extent that English law shall not deprive you of any legal protection accorded in accordance with the law of the place where you are habitually resident ("Local Law"). In the event English law deprives you of any legal protection which is accorded to you under Local Law, then these terms shall be governed by Local Law and any dispute or claim arising out of or in connection with these Terms shall be subject to the non-exclusive jurisdiction of the courts where you are habitually resident.

You may print and keep a copy of these Terms, which form the entire agreement between you and Mondaq and supersede any other communications or advertising in respect of the Service and/or the Website.

No delay in exercising or non-exercise by you and/or Mondaq of any of its rights under or in connection with these Terms shall operate as a waiver or release of each of your or Mondaq’s right. Rather, any such waiver or release must be specifically granted in writing signed by the party granting it.

If any part of these Terms is held unenforceable, that part shall be enforced to the maximum extent permissible so as to give effect to the intent of the parties, and the Terms shall continue in full force and effect.

Mondaq shall not incur any liability to you on account of any loss or damage resulting from any delay or failure to perform all or any part of these Terms if such delay or failure is caused, in whole or in part, by events, occurrences, or causes beyond the control of Mondaq. Such events, occurrences or causes will include, without limitation, acts of God, strikes, lockouts, server and network failure, riots, acts of war, earthquakes, fire and explosions.

By clicking Register you state you have read and agree to our Terms and Conditions